List of ongoing projects
Consultancy Projects:
Sr. No. | Start Date | Principal Investigator | CO Principal Investigator | Project Title |
---|---|---|---|---|
1. | 22-07-2014 | Abhishek . | C S UPADHYAY ABHIJIT KUSHARI |
Development Of Autonomous Rotary Unmanned Aerial Vehicle (Ruav) In 10 Kg Weight Class |
2. | 01-04-2015 | A K Ghosh | G. M. Kamath | Flight Lab Training Program For Pvt. Engg College |
3. | 23-05-2016 | Kamal Poddar | Wind Tunnel Model Study Of Bridge No.44,53 & 65 In Tupul- Jiribam Section Of N.F. Railway In Manipur. | |
4. | 15-11-2016 | A K Ghosh | Aerodynamic Design Of Uav | |
5. | 01-04-2018 | Kamal Poddar | Flexible Heads With Salary, Consumable, Contigency, Equipment And Ta | |
6. | 01-02-2019 | Kamal Poddar | Wind Tunnel Study For 150m High Rcc Chimney Of Fgd Project Of Darlipali Super Critical Thermal Power | |
7. | 01-02-2019 | Kamal Poddar | Wind Tunnel Study For 150m High Rcc Ghimney Of Fgd Project Of Vindhyachal Super Thermal Power Project | |
8. | 22-04-2019 | Kamal Poddar | DEBOPAM DAS ALAKESH CHANDRA MANDAL |
Wind Tunnel Model Study Of Siarang Section Of Nf Railway In Mizoram |
9. | 01-11-2019 | Kamal Poddar | Wind Tunnel Study For 150m High Rcc Chimney Of Fgd Project For 2x500 Mw Durgapur Steel Tps Fgd Project | |
10. | 01-11-2019 | Kamal Poddar | Wind Tunnel Study For 150m High Rcc Chimney Of Fgd Project For 2x600 Mw Raghunathpur Tps Fgd Gujarat | |
11. | 01-11-2019 | Kamal Poddar | Wind Tunnel Study For 150m High Rcc Chimney Of Fgd Project For 2x500 Mw Mejia Tps Fgd Project | |
12. | 23-12-2019 | Kamal Poddar | Wind Tunnel Study For 150m & 240m High Rcc Chimney For Stage-I & Stage-Ii (6x210mw+2x500mw)Of Vindhyanchal Super Thermal Power Project | |
13. | 23-01-2020 | Kamal Poddar | Wind Tunnel Study For 275m High Chimney 2x660mw Sjvn Thermal (P) Limited At Buxar, Bihar | |
14. | 01-06-2020 | Kamal Poddar | Wind Tunnel Testing Of Two Chimneys (180m & 225m High) For 5x210mw Unchahar Wfgd | |
15. | 15-06-2020 | Abhishek . | KETAN RAJAWAT Mangal Kothari |
Vtol Uav Design And Development For 7kg Payload |
16. | 01-07-2020 | Kamal Poddar | DEBOPAM DAS | Wind Tunnel Testing For 2x700mw Rajpura Stpr Rajpura Punjab |
17. | 17-08-2020 | Kamal Poddar | Wind Tunnel Testing For 150mtr Rcc Chimney For Fgd Package At Vallur Tps (3x500mw) Tamil Nadu | |
18. | 17-08-2020 | Kamal Poddar | Wind Tunnel Testing For 150mtr Rcc Chimney For Fgd Package At Talcher Tps Stage I & Ii (2x250mw+4x500mw) Odisha | |
19. | 21-10-2020 | Kamal Poddar | Wind Tunnel Study Of 150m High Rc Chimney For Dvc Bokaro Fgd Project | |
20. | 01-01-2021 | Kamal Poddar | Wind Tunnel Testing For 125m High Fgd Chimneys For 5x830mw Cgpl Mundra Tps |