Aerospace Engineering

Indian Institute of Technology Kanpur


List of ongoing projects

Consultancy Projects:
Sr. No.Start DatePrincipal InvestigatorCO Principal InvestigatorProject Title
1. 22-07-2014 Abhishek . C S UPADHYAY
ABHIJIT KUSHARI
Development Of Autonomous Rotary Unmanned Aerial Vehicle (Ruav) In 10 Kg Weight Class
2. 01-04-2015 A K Ghosh G. M. Kamath Flight Lab Training Program For Pvt. Engg College
3. 23-05-2016 Kamal Poddar   Wind Tunnel Model Study Of Bridge No.44,53 & 65 In Tupul- Jiribam Section Of N.F. Railway In Manipur.
4. 15-11-2016 A K Ghosh   Aerodynamic Design Of Uav
5. 01-04-2018 Kamal Poddar   Flexible Heads With Salary, Consumable, Contigency, Equipment And Ta
6. 01-02-2019 Kamal Poddar   Wind Tunnel Study For 150m High Rcc Chimney Of Fgd Project Of Darlipali Super Critical Thermal Power
7. 01-02-2019 Kamal Poddar   Wind Tunnel Study For 150m High Rcc Ghimney Of Fgd Project Of Vindhyachal Super Thermal Power Project
8. 22-04-2019 Kamal Poddar DEBOPAM DAS
ALAKESH CHANDRA MANDAL
Wind Tunnel Model Study Of Siarang Section Of Nf Railway In Mizoram
9. 01-11-2019 Kamal Poddar   Wind Tunnel Study For 150m High Rcc Chimney Of Fgd Project For 2x500 Mw Durgapur Steel Tps Fgd Project
10. 01-11-2019 Kamal Poddar   Wind Tunnel Study For 150m High Rcc Chimney Of Fgd Project For 2x600 Mw Raghunathpur Tps Fgd Gujarat
11. 01-11-2019 Kamal Poddar   Wind Tunnel Study For 150m High Rcc Chimney Of Fgd Project For 2x500 Mw Mejia Tps Fgd Project
12. 23-12-2019 Kamal Poddar   Wind Tunnel Study For 150m & 240m High Rcc Chimney For Stage-I & Stage-Ii (6x210mw+2x500mw)Of Vindhyanchal Super Thermal Power Project
13. 23-01-2020 Kamal Poddar   Wind Tunnel Study For 275m High Chimney 2x660mw Sjvn Thermal (P) Limited At Buxar, Bihar
14. 01-06-2020 Kamal Poddar   Wind Tunnel Testing Of Two Chimneys (180m & 225m High) For 5x210mw Unchahar Wfgd
15. 15-06-2020 Abhishek . KETAN RAJAWAT
Mangal Kothari
Vtol Uav Design And Development For 7kg Payload
16. 01-07-2020 Kamal Poddar DEBOPAM DAS Wind Tunnel Testing For 2x700mw Rajpura Stpr Rajpura Punjab
17. 17-08-2020 Kamal Poddar   Wind Tunnel Testing For 150mtr Rcc Chimney For Fgd Package At Vallur Tps (3x500mw) Tamil Nadu
18. 17-08-2020 Kamal Poddar   Wind Tunnel Testing For 150mtr Rcc Chimney For Fgd Package At Talcher Tps Stage I & Ii (2x250mw+4x500mw) Odisha
19. 21-10-2020 Kamal Poddar   Wind Tunnel Study Of 150m High Rc Chimney For Dvc Bokaro Fgd Project
20. 01-01-2021 Kamal Poddar   Wind Tunnel Testing For 125m High Fgd Chimneys For 5x830mw Cgpl Mundra Tps